Projects of Interest

Some projects of interest from our company are:

Village Health Lincoln Road

Higgs Construction delivered the two level, Village Health Medical Centre complex in early 2019. The structure is a mix of structural steel and long run LVL timber members on an specific designed foundation. Large pre-nail frames clad in continuous vertical cedar weatherboards and coloursteel traditional tray cladding along with a large architectural window suite completes... read full article.

St Georges Hospital

We are currently heavily involved in the redevelopment of St George’s Hospital. With Stages 1a, 1b and Stage 2 complete, we are now constructing the Stage 3 Cressy Wing. Redevelopment of St George’s Hospital. Stage 1 Consisted of a New Cancer Care Facility and a Link to the existing Canon Wilford Wing. Both structures are of concrete... read full article.

Tait Communications Headquarters

2015 SCNZ Award for Excellence.

Completion Achieved – Awards Piling In …. In October 2014, another major project was completed by Higgs Construction, on time and to budget. In May 2013, Higgs Construction Limited commenced the construction of the new $21 Million “Building No.1” of the New Tait Communications Campus. With only the separate siteworks contract remaining, the new building now sits completed within... read full article.

Knox Presbyterian Church Rebuild

Heritage / Restoration - 2016 Gold Award Winner.

Higgs Construction, completed the rebuild works at the end of last year. The project consists of a new independent structural frame protecting the existing timber frame from further damage, a new exterior façade and exterior finishes and a refurbishment / reinstatement of the existing interior using salvaged material from the pre-damaged interior. Due to the... read full article.

Lincoln University

Landscape Architecture Building & New Dining Hall, Cafe & Kitchen

We have completed a number of projects for Lincoln University over the years. Below we have featured two of them. New Kitchen, Dining Hall and Café Recently completed was the New Kitchen, Dining Hall and Café project. The new $7.5 million development opened in February 2014, following the completion of the New Dining Hall which was an addition... read full article.

Mary Potter Apartments, 444 Durham Street, Residential Development

2016 NZIA Award - Housing - Multi Unit Award

The new Residential Development for the Little Company of Mary, New Zealand at 444 Durham Street, Christchurch. The development includes twelve residential units comprising of two one bedroom dwellings and ten two bedrooms dwellings, associated carpark and extensive landscaping. The exterior finishes include vertical cedar weatherboards, Eurotray Roofing and Wall Cladding and other specialist finishes. Higgs Construction and... read full article.

The Old Government Building

Cathedral Square The Old Government Building (OGB) was originally constructed between 1911 and 1913. During the 1990’s we were involved with the conversion of this old building into suites for the Heritage Hotel. Following the Canterbury earthquakes, extensive repairs were carried out to both the interior and exterior over a 12 month period with a workforce of up to... read full article.

Lyttelton Tunnel Control Building

The Lyttelton Tunnel Control Building had its public opening in August 2014 after its completion earlier in that year. In July 2013, Higgs Construction Limited commenced the construction of the new Lyttelton Tunnel Control Building. The existing Tunnel Control Building suffered significant damage during the February 2011 earthquakes. Earlier in 2013 the existing building was demolished to make way for... read full article.

Kaiapoi Aquatic Centre Rebuild

Project completed …. The Kaiapoi Aquatic Centre was closed following the February earthquakes. Demolition of the existing structure commenced in September 2012. Higgs Construction has completed the Earthquake Repairs and Rebuild. The project was completed and handed back to the Waimakariri District Council in July 2013 and was officially opened by the Prime Minister, John... read full article.

The University of Otago – School of Medicine

(Located at Christchurch Hospital) This project started as a relatively small project, however due to the Canterbury earthquakes the project evolved into a structural repair, interior strip out and retrofit of a 10 storey building. Together with the Otago University School of Medicine and the design team, we completed the detailed repairs and strengthening. The project comprised... read full article.

Current Projects Under Construction

We have a number of projects under construction at one time. Some of the current projects under construction are: St Georges Hospital, Cressy Wing, Stage 3 – $49m Stage 3 (under construction) The Cressy Wing, is a new five level structure on the Leinster Road side of the St Georges Hospital site. This building is a... read full article.

The Copthorne Hotel

Durham Street This building was extensively damaged during the September 2010 earthquake. The damage was essentially non structural and we were engaged to repair the 10 storey hotel as quickly as possible to allow the hotel to reopen and continue its operation. Our work involved stripping the entire building back to the framing and replacing or... read full article.

The Westpac Canterbury Centre

Prior to 2010 we retrofitted the majority of the floors in the Canterbury Centre for Westpac. The Canterbury Centre was one of the larger buildings in Christchurch and was the South Island head office of Westpac. Westpac employed approximately 400 people throughout the building. Our work involved the progressive removal of the existing offices and... read full article.